Kempas Baru railway station

Kempas Baru
General information
Other names
LocationKempas, Johor Bahru District, Johor, Malaysia
Coordinates1°32′07.3″N 103°43′23.8″E / 1.535361°N 103.723278°E / 1.535361; 103.723278
OwnerRailway Assets Corporation
OperatorKeretapi Tanah Melayu
LineWest Coast Line
Platforms2 side platforms and 2 island platforms
Tracks4
Construction
ParkingAvailable
History
Rebuilt6 February 2024 (2024-02-06)
Electrified12 December 2025 (2025-12-12)
Former namesKempas Bahru
Services
Preceding station KTM Komuter Following station
Kulai
towards Paloh
Paloh–JB Sentral Line Johor Bahru Sentral
Terminus
Terminus Kempas Baru–Pasir Gudang Line Pasir Gudang
Terminus
Preceding station ETS Following station
Kulai KL Sentral–JB Sentral (Platinum) Johor Bahru Sentral
Terminus
Kulai
towards Padang Besar
Padang Besar–JB Sentral (Platinum)
Kulai
towards Butterworth
Butterworth–JB Sentral (Platinum)
Kulai
towards Padang Besar
Padang Besar–JB Sentral (Gold)
Preceding station Keretapi Tanah Melayu (Intercity) Following station
Kulai
towards Tumpat
Ekspres Rakyat Timuran Johor Bahru Sentral
Terminus
Location

The Kempas Baru railway station (formerly Kempas Bahru railway station) is a Malaysian train station located in the Kempas district of Johor Bahru, Johor.

History

The station's history dates back to the Federated Malay States Railway (FMSR). In February 2024, the station was relocated to a new facility as part of the Gemas–Johor Bahru Electrified Double Track Project (EDTP).[1] Since 12 December 2025, the station has been integrated into the electrified rail network, serving both ETS and commuter services.

Modernization and strategic role

Following its 2024 relocation, the station was reconfigured into a four-track, multi-platform facility designed to support high-density traffic in the Southern Corridor.

Operational significance

As of June 2026, Kempas Baru station functions as a critical railway interchange, operating on a hub-and-spoke model. It serves as the primary pivot point between the main Southern Corridor trunk line and the Pasir Gudang feeder branch. Due to track configuration constraints, the station acts as the mandatory transfer hub for passengers commuting from the Pasir Gudang line toward the JB Sentral and Kulai corridors.

The station serves as a pivotal interchange for the newly launched KTM Komuter Southern Sector service, which officially began operations on 16 June 2026, connecting the Kulai–JB Sentral route with the Kempas Baru–Pasir Gudang feeder line.[2]

Due to the temporary suspension of train services at JB Sentral station beginning 11 June 2026 to facilitate construction works for the RTS Link, Kempas Baru station has been designated as the primary transit hub for affected passengers, with KTMB providing intermediary bus services to connect to Johor Bahru city centre.[3]

Infrastructure layout

  • Track and Platform Layout: The station features two side platforms and two island platforms, serving four tracks.
  • Electrification: The facility utilizes 25 kV AC overhead catenary systems, supporting the modernized EMU fleet operational in the region.

References

  1. ↑ Keretapi Tanah Melayu Berhad (5 February 2024). "Stesen Kempas Baru akan berpindah ke lokasi baharu". Retrieved 20 June 2026.
  2. ↑ Harith Mustaffa (16 June 2026). "New train service links Johor Bahru Sentral to Pasir Gudang, Kulai". The Straits Times. Retrieved 20 June 2026.
  3. ↑ "JB Sentral closure: KTMB activates bus transfers amid RTS Link project works from June 11". Malay Mail. 10 June 2026. Retrieved 20 June 2026.