Kłodzko Miasto railway station

Kłodzko Miasto

Kłodzko Town
Kłodzko Miasto railway station in 2023
General information
LocationKłodzko, Lower Silesian Voivodeship
Poland
OwnerPolskie Linie Kolejowe
LineWrocław–Międzylesie
Platforms2
Tracks4
Train operators
History
Opened1875
Rebuilt2021
Electrified1994
Former names
  • Glatz Stadt (before 1945)
  • Kładzko Miasto (1945–1946)
Services
Preceding station KD Following station
Kłodzko Główne D90 Kłodzko Książek
towards Kudowa-Zdrój
Kłodzko Główne D96
Location
Kłodzko Miasto is located in Poland
Kłodzko Miasto
Kłodzko Miasto
Location within Poland
Kłodzko Miasto is located in Lower Silesian Voivodeship
Kłodzko Miasto
Kłodzko Miasto
Location within Lower Silesian Voivodeship

Kłodzko Miasto (lit. 'Kłodzko Town'; German: Glatz Stadt) is a railway station in the town of Kłodzko, in the Lower Silesian Voivodeship in south western Poland. The station is located in the very center of the town, on the right bank of the Eastern Neisse river. It is approximately 370 meters southeast of the town square, i.e., Bolesław Chrobry Square.[1] According to PKP classification, it is categorized as a regional station.[2]

History

1875–1900

In 1875, Kłodzko Główne railway station was built, which was located far from the town (situated in the village of Goszyce), making it considerably difficult for passengers to use. Therefore, the city authorities decided to construct a passenger stop near the current pl. Jedności. The land for its construction was provided to the railway by the city free of charge. The newly established railway station was squeezed between the existing buildings. The increase in passenger traffic made its expansion necessary, which was discussed during city council sessions.[3]

Station building that was demolished in the 1970s

1900–1945

At the beginning of the 20th century, a small city station building was erected. The existing railway station was a temporary solution, which is the reason a plan for its reconstruction was developed before the First World War. The costs of this project were estimated at 16 million marks, and therefore it was abandoned. In 1934, these plans were revisited. The investment was to be carried out over 5 years and was expected to cost about 4 million new marks. The project was to provide employment for 200 people, which would significantly reduce the unemployment that prevailed in Kłodzko at that time.

After a year, the effects of the initial works were visible: a high embankment and an overpass were completed, and the surrounding streets were reconstructed.[4] Additionally, two more platforms were built, each having two edges. The layout of the existing platform was corrected. A connection between the platforms was made via an underground passage, along with a technical tunnel with shafts for freight elevators.[5] As a result of the outbreak of World War II in 1939, the project was not completed.[4]

After 1945

Railway station during its reconstruction in 2019

After World War II, the area came under Polish administration. As a result, the station was taken over by Polish State Railways. In the 1970s, in connection with the redevelopment of Unity Square, plans for the expansion of the railway station were revisited. At that time, among other things, abutments were built for an additional viaduct over the roadway leading to the third track. However, the work was soon halted, citing financial reasons and the necessity of demolishing the PKS station. On this occasion, in 1974, the station building was demolished. In the same year, a modest ticket office building was constructed between the tracks, which also housed a waiting room.[6] In January 2021, the modernization with the reconstruction of the railway stop into a railway station was completed. A second platform and a KM signal box were built. A ramp to platform 1 from Kościuszko Street was constructed, and elevators were installed to all platforms. Trains can now terminate or commence a journey.[7][8][9] The contract in this matter was signed on 11 June 2018, with the company Infra Silesia.[10]

Passenger traffic and trains

Year Passenger exchange per day
2017[11] 1,100
2022[12] 1,800

Passenger trains on the Międzylesie (Bystrzyca Kłodzka Przedmieście)–Wrocław Główny route and back, as well as from Kudowa-Zdrój to Legnica and from Kudowa-Zdrój to Wałbrzych Główny, operated by Lower Silesian Railways, Polregio, and PKP Intercity, pass through Kłodzko Miasto. Additionally, several times a day freight trains, mainly from Wrocław and Kłodzko Główny, including those owned by the company PKP Cargo, pass through the station.

Railway lines

Through the town of Kłodzko passes Wrocław–Międzylesie railway, as well as Kłodzko–Kudowa-Zdrój railway.[a] The first of these has been fully electrified since the 1990s and is double-tracked. The second, is non-electrified and single-tracked.[13]

Maximum operatable speeds of railway lines near Kłodzko Miasto[14]
Railway line Passenger trains (also railbuses) Freight trains
Wrocław–Międzylesie railway 80 km/h (50 mph) 80 km/h (50 mph)
Kłodzko–Kudowa Zdrój railway 30 km/h (19 mph) 30 km/h (19 mph)[15]

Infrastructure

Station building

The station building was demolished in 1974 in connection with the planned modernization and reconstruction of the local railway station. It was replaced by a hastily constructed ticket office building, located between two tracks on the first platform, which was situated on an overpass between Jedności Square and Słowackiego Street. In 2019, during the station's reconstruction, the building was demolished, and currently, there are no ticket offices or waiting rooms. There are two entrances to the station: the first from the side of Jedności and Kościuszki Square, and the second from Słowackiego Street.[16]

Platforms

The station has two platforms, each with two platform edges and canopies. Each platform can be accessed by an elevator.

Train services

The station is served by the following services:

  • Regional services (KD) Wrocław - Kłodzko Główne - Kudowa-Zdrój[17]
  • Regional services (KD) Wałbrzych - Kłodzko - Kudowa-Zdrój[18]

Notes

  1. ↑ According to some studies, this line does not start from Kłodzko Główne station, but from the Kłodzko Nowe junction post.

References

  1. ↑ Kłodzko. Plan Miasta, 1:10,000, 3rd edition, Wrocław-Warsaw 1999.
  2. ↑ A list of passenger stations along with their categorization and the determination of accessibility to the facility, l.p. 176
  3. ↑ Kłodzko. Dzieje miasta, edited by R. Gładkiewicz, Kłodzko 1998.
  4. 1 2 Kłodzko. Dzieje Miasta, op. cit., p. 129.
  5. ↑ Information from the website of the Informal Association of Friends of the Kłodzko Land
  6. ↑ Information from the Railways on the Kłodzko Land
  7. ↑ 22 mln zł na modernizację stacji kolejowej Kłodzko Główne (in Polish), 2017-08-19, retrieved 2026-08-13
  8. ↑ Szymadja, Michał (2017-08-19), Modernizacja Kłodzka Głównego już za chwilę. Kłodzko Miasto – w przyszłym roku (in Polish), retrieved 2026-08-13
  9. ↑ Kłodzko Miasto przemienia się w stację (in Polish), retrieved 2026-08-13
  10. ↑ Jest umowa na przystanek Kłodzko Miasto (in Polish), 2018-06-11, retrieved 2026-08-13
  11. ↑ "Największe i najmniejsze stacje w Polsce" (in Polish). Retrieved 2026-08-13.
  12. ↑ "Wymiana pasażerska - Dane o stacjach 2022" (in Polish). Retrieved 2026-08-13.
  13. ↑ M. Jerczyński, S. Koziarski, Sto lat kolei na Śląsku, Opole 1991, p. 21.
  14. ↑ Potocki, Marek. "Linia Wrocław Główny – Międzylesie – (Lichkov) (276/481)". bazakolejowa.pl (in Polish). Retrieved 2026-08-13.
  15. ↑ Potocki, Marek. "Linia Kłodzko Nowe – Kudowa Zdrój (– Náchod) (309)". bazakolejowa.pl. Retrieved 2026-08-13.
  16. ↑ Information on the website of the Kłodzko Land Railways
  17. ↑ "D90 Wrocław Główny - Strzelin - Kłodzko Główne - Kudowa-Zdrój" (PDF). Rozkład jazdy (in Polish). Lower Silesian Railways. 14 June 2026.
  18. ↑ "D96 Wałbrzych Miasto - Wałbrzych Główny - Nowa Ruda - Kłodzko Główne - Kudowa-Zdrój" (PDF). Rozkład jazdy (in Polish). Lower Silesian Railways. 14 June 2026.

Further reading