Indore–Budhni line

Indore–Budhni line
Overview
StatusUnder construction
OwnerIndian Railways
LocaleMadhya Pradesh, India
Termini
Stations18
Service
TypeBroad gauge
SystemIndian Railways
Operator(s)Western Railway
West Central Railway
Technical
Line length198 km (123 mi)
Number of tracks1
CharacterAt grade, with tunnels and viaducts
Track gauge5 ft 6 in (1,676 mm) broad gauge
ElectrificationElectrified
Operating speed160 km/h (99 mph) (design speed)

The Indore–Budhni railway line is an under-construction broad gauge railway line in the Indian state of Madhya Pradesh. It connects Manglaya Sadak near Indore with Budhni, providing a direct rail link between the Indore region and the existing national railway network at Budhni.

The project is being implemented by Rail Vikas Nigam Limited (RVNL). Current Government of India project-monitoring records identify it as the Indore–Budni New Railway Line [198 kms], with an updated project cost of ₹7,474 crore and a target completion date of 30 September 2030.[1]

History

The Cabinet Committee on Economic Affairs (CCEA) approved the construction of a new broad-gauge line between Budni and Indore (Mangliya Gaon) in September 2018. The project was originally sanctioned as a 205.5 km (128 mi) line at an estimated cost of ₹3,261.82 crore, including electrification.[2]

The project aims to improve railway connectivity in western Madhya Pradesh and provide an alternative route between Indore and destinations towards eastern and southern India. The original proposal noted that the line would reduce rail distance between Indore and Jabalpur by approximately 68 kilometres (42 mi) compared to the route via Bhopal.

The alignment serves previously unserved interior hubs, including Nasrullaganj, Khategaon, and Kannod. Project-monitoring records later updated the sanctioned route length to 198 km (123 mi).

Route and stations

The line originates at Mangliya Gaon near Indore and moves eastward through Indore district, Dewas district, and Sehore district before connecting to the main network at Budhni.

RVNL's project documentation identifies 18 planned stations along the corridor, comprising 15 crossing stations and 3 halt stations.[3]

#Station nameStation codeConnections
1Manglia GaonMGGIndore Junction / Main Network
2Panod—None
3Samaliya Chau—None
4Raghogarh—None
5Chapda—None
6Kheri—None
7Hathnora—None
8Deoli—None
9Kannod—None
10Rehti—None
11Khategaon—None
12Pipaliya Nankar—None
13Bapcha—None
14Nasrullaganj—None
15Ramgarh Barghau—None
16Salkanpur—None
17Balkhera—None
18BudhniBNIBhopal–Nagpur section

Infrastructure and engineering

The corridor is engineered as an electrified broad-gauge route with a design speed of 160 km/h (99 mph). The infrastructure features major viaducts, road underbridges (RUBs), road overbridges (ROBs), and tunnels, operating completely level-crossing-free.

Tunnels

The project features two major tunnels with a combined length of 9.88 km (6.14 mi).[4]

TunnelChainageLength
Tunnel 133+160 – 34+4001.24 km (0.77 mi)
Tunnel 257+400 – 66+0408.64 km (5.37 mi)

Status and construction

Civil engineering, track-laying, electrification, and signaling works are being carried out in packages by RVNL. The main tunnel construction contract was awarded at a cost of approximately ₹872.69 crore.

As of August 2026, construction is ongoing across the corridor. Project monitoring records under code 705763 indicate physical progress of 35% with a cumulative expenditure of ₹2,529.03 crore through early 2026.[5]

See also

References

  1. ↑ "PAIMANA Public Dashboard". Ministry of Statistics and Programme Implementation. Retrieved 17 August 2026.
  2. ↑ "Cabinet approves Indore (Mangaliyagaon) — Budni New Line (205.5 Km) with Electrification". Press Information Bureau. 19 September 2018. Retrieved 17 August 2026.
  3. ↑ "Indore-Budni New Rail Line: Changing the Face of Connectivity in Madhya Pradesh". Rail Vikas Nigam Limited. 16 July 2026. Retrieved 17 August 2026.
  4. ↑ "Disclosure regarding award of contract for tunnel works on the Indore-Budni railway line" (PDF). Rail Vikas Nigam Limited. Retrieved 17 August 2026.
  5. ↑ "Flash Report — March 2026" (PDF). Ministry of Statistics and Programme Implementation. 2026. Retrieved 17 August 2026.