Hyderabad–Amaravati Greenfield Expressway
| Hyderabad–Amaravati Greenfield Expressway | |
|---|---|
| Route information | |
| Maintained by NHAI | |
| Length | 298 km (185 mi) |
| Status | Proposed / Under Survey |
| Major junctions | |
| West end | Mucherla (Future City), Hyderabad |
| East end | Amaravati / Machilipatnam |
| Location | |
| Country | India |
| States | Telangana, Andhra Pradesh |
| Highway system | |
The Hyderabad–Amaravati Greenfield Expressway is a proposed 298-kilometre-long (185 mi), six-lane, access-controlled highway connecting the capital cities of Telangana and Andhra Pradesh.[1] The project is designed as a "straight-line" greenfield corridor to reduce travel time between the two cities to approximately 2.5 hours.[2]
Route
The expressway originates near Tippareddypalli in Mucherla (Future City) and follows a new alignment that bypasses the congested NH-65. It passes through the following districts:
- Telangana (118 km): Ranga Reddy district, Nalgonda district (passing through the Miryalaguda region), and Suryapet district.[3]
- Andhra Pradesh (180 km): Palnadu district (Sattenapalli), Guntur district, Amaravati, and extends to Machilipatnam (Bandar Port).[4]
High-speed rail corridor
A semi-high-speed rail corridor is planned to run parallel to the expressway, aiming to reduce travel time between Hyderabad and Amaravati to 1.5 hours.[5]
Following a request from the Telangana government, the South Central Railway (SCR) revised the alignment to follow this greenfield path. This shift officially identifies Miryalaguda as a key station on the route, replacing the previous alignment that passed further north through Suryapet.[6]
Status
As of early 2026, the National Highways Authority of India (NHAI) is finalizing the detailed project report. The central government has committed to funding the project, estimated at ₹25,000 crore, which includes total land acquisition costs.[7]
References
- ↑ Rajeev, M. (April 10, 2025). "Hyderabad-Amaravati greenfield expressway gets Centre's nod". The Hindu. Retrieved March 6, 2026.
- ↑ "Hyderabad–Amaravati Greenfield Expressway: A Game Changer". AmrAditya. September 18, 2025. Retrieved March 6, 2026.
- ↑ "CM seeks rail line to align with Future City-Bandar Port highway". The Times of India. September 12, 2025. Retrieved March 6, 2026.
- ↑ "Centre clears Amaravati-Hyderabad greenfield expressway". Deccan Chronicle. April 9, 2025. Retrieved March 6, 2026.
- ↑ "South Central Railway - Survey for New Lines". South Central Railway. Retrieved March 6, 2026.
- ↑ The Hindu Bureau (February 1, 2026). "Hyderabad's high-speed rail corridors likely to follow new elevated alignment". The Hindu. Retrieved March 6, 2026.
- ↑ "Land Acquisition Notifications". Nalgonda District Official Portal. Retrieved March 6, 2026.