Citicore Solar Batangas 1

Citicore Solar Batangas 1
CountryPhilippines
LocationTuy, Batangas
StatusOperational
Commission dateSeptember 2025
OwnerCiticore Solar Batangas 1, Inc.
Solar farm
TypeFlat-panel PV
Power generation
Nameplate capacity197 MW

Citicore Solar (CS) Batangas 1 is a 197-megawatt (MW) photovoltaic power station in Tuy, Batangas, Philippines.

History

On September 15, 2025, the Citicore Solar Batangas 1 was inaugurated in a ceremony led by President Bongbong Marcos.[1]

Facilities

CS Batangas 1 has as 197-megawatt (MW) capacity solar power plant and a 320-MW-hour battery energy storage system (BESS). It is the first baseload-capable solar station meaning it could store and deliver electricity beyond the typical solar hours.[1] It has a baseload of 50-MW and is connected to the national grid. CS Batangas 1 is also agrisolar which means that the land the photovoltaic facility is also simultaneously used to grow crops.[2]

Management

The facility is ran by Citicore Renewable Energy Corp. (CREC) through its subsidiary Citicore Solar Batangas 1, Inc.[3]

References

  1. 1 2 Flores, Helen; Lelis, Brix (16 September 2025). "Philippines first baseload solar farm launched". The Philippine Star. Retrieved 19 September 2025.
  2. ↑ Manahan, Job (15 September 2025). "Marcos leads ceremonial energization of Batangas solar power plants". ABS-CBN News. Retrieved 19 September 2025.
  3. ↑ "CREC unit seeks ERC nod for grid integration of Batangas solar project". BusinessWorld. 13 March 2025. Retrieved 19 September 2025.