Changzhou North Railway Station (metro)
Changzhou North Railway Station 常州北站 | |||||
|---|---|---|---|---|---|
![]() | |||||
| General information | |||||
| Location | Changjiang North Rd. No.8 | ||||
| Coordinates | 31°51′22″N 119°57′03″E / 31.8561°N 119.9507°E | ||||
| Owner | Changzhou Metro Group Co., Ltd. | ||||
| Operator | Changzhou Metro Group Co., Ltd. | ||||
| Line | Line 1 (Changzhou Metro) | ||||
| Platforms | 1 island platform | ||||
| Connections | Changzhou North Railway Station (Beijing–Shanghai high-speed railway)
Changzhou BRT: B10 Changzhou Bus: 13, 26, 27, 35, 44, 44A, 59, 90, 529, T2, Airport bus | ||||
| Construction | |||||
Structure type | Underground | ||||
| Accessible | Yes | ||||
| Other information | |||||
| Status | In use | ||||
| History | |||||
| Opened | 21 September 2019[1] | ||||
| |||||
Changzhou North Railway Station is a station on Changzhou Metro Line 1.
Connection
Changzhou North Station
Bus
- Changzhou BRT: B10[2]
- Changzhou Bus: 13, 26, 27, 35, 44, 44A, 59, 90, 529, T2, Airport bus
High-speed railway
References
- ↑ "第35城!常州地铁将于9月21日开通". 界面新闻. 2019-09-19. Archived from the original on 2020-01-30. Retrieved 2020-01-30.
- ↑ 高德地圖 (Map).
