Bohunice Nuclear Power Plant

Jaslovské Bohunice Nuclear Power Plant
CountrySlovakia
Coordinates48°29′40″N 17°40′55″E / 48.49444°N 17.68194°E / 48.49444; 17.68194
StatusOperational
Construction began1 August 1958
Commission date25 December 1972
Decommission date2006, 2008
OwnersSlovenské elektrárne a.s., a.s. (V2), Javys, a.s. (A1 and V1)
OperatorElectrostation Bohunice
Power generation
Units operational2 x 471 MW
Units decommissioned2 x 408 MW,
1 x 93 MW
Nameplate capacity942 MW
Capacity factor87.9%
Annual net output7,779 GW·h
External links
CommonsRelated media on Commons

The Jaslovské Bohunice Nuclear Power Plant (NPP) (Slovak: Atómové elektrárne Jaslovské Bohunice, abbr. EBO) is a complex of nuclear reactors situated 2.5 km from the village of Jaslovské Bohunice in the Trnava District of western Slovakia.

Bohunice NPP consists of three plants: A1 (shut down—one reactor unit), V1 and V2 (both containing two reactor units). The plant was connected to the national power network in stages in the period between 1978 and 1985. The four power reactors are pressurized water reactors of the Soviet VVER-440 design.

Annual electricity generation averages about 12,000 GWh. Upon development of a district heating supply network in the town of Trnava near Bohunice NPP, V2 switched to co-generation. Part of this system is a heat feeder line commissioned in 1987. In 1997, a heat feeder line to Leopoldov and Hlohovec was created, branching off from the Trnava line.

Reactor data

The Bohunice Nuclear Power Plant hosts two active VVER-440 reactors, while two older VVER-440s and a KS 150 reactor have been decommissioned. The Slovak government plans to build a new AP1000 unit on the site, which is to begin operation between 2038 and 2040.

Reactor type Power (thermal) Power (electric) Construction started Commenced operations Closure Status
A1 1x KS 150 770 MW 143 MWe 1958[1] 1972 1977 Undergoing decommissioning Involved in the 1976 accident
V1 2x VVER-440/230 2,750 MW 880 MWe 1972 1978 2008 Undergoing decommissioning First VVER plant in Czechoslovakia
V2 2x VVER-440/213 2,750 MW 942 MWe 1976 1984 In service Operational Currently the only operational unit
New nuclear source 1x AP1000 3415 MW 1110 MWe – 2038–2040[2] Planned Planned

Bohunice A1 (decommissioned)

The A1 plant was the first to be built on the site and the only one to ever host a KS 150 reactor. Designed and built in Czechoslovakia between 1958 and 1972, the KS 150 used non-enriched uranium as fuel. Unlike conventional reactors, refuelling was carried out while the reactor was in operation.[3] From the beginning, there were various problems with its operation, and a number of accidents occurred, related to the reactor's experimental design.[4] In 1976, the first major accident at the plant took place. During a fuel change, the carbon dioxide used to cool the reactor began leaking, resulting in the death of two workers and the scramming of the reactor. A second major accident, which received a fourth-degree rating by INES, occurred during refuelling in February 1977. A decision was subsequently made to shut down the reactor, due to the high cost of repairs following the accident as well as inefficiency of operation. The Czechoslovak government decided to build additional conventional Soviet reactors of the VVER type instead, which have a higher power output, with a more efficient operational process. The A1 power plant was closed and began a decommissioning and cleanup process.[5]

Bohunice V1 (decommissioned)

As a condition of accession into the European Union in 2004, Slovakia was required to deactivate the two reactors at the V1 plant. A provision in the accession treaty allowed for reactivation in case of an emergency.[6]

The V1 plant was exempted from the sale of Slovenské Elektrárne to Enel and transferred to the Slovak Nuclear and Decommissioning Company, which was fully owned by the state. The first reactor was shut down at the end of 2006 and the second on the last day of 2008.[7]

The Russia-Ukraine gas dispute in January 2009 disrupted natural gas supplies and electricity generation. On 10 January, the Slovak government ordered the second reactor, then still undergoing a shutdown procedure, to be returned to power-generation-capable mode.[8] The reactor was ultimately not reconnected to the grid, and the shutdown resumed.[9]

Bohunice V2 (operating)

Bohunice V2 consists of two second-generation VVER-440/213 units that went online on 20 August 1984 and 18 December 1985, respectively. In November 2010, both reactors were uprated from 440 MW to 505 MW (gross electrical output), and operation is planned to be maintained until 2055.[10]

Planned reactor

The idea of building a new unit at the Bohunice plant was first proposed during prime minister Robert Fico's first term, in 2006.[11] By 2026, the American company Westinghouse's AP1000 was chosen as the preferred design, in favour of other competing reactors such as the South Korean APR-1400 and the French EPR. Construction is slated to begin in 2032.[12][13]

References

  1. ↑ "Slovenské Elektrárne".{{cite web}}: CS1 maint: url-status (link)
  2. ↑ "Bohunice čaká veľký americký test. Saková podpísala kľúčovú štúdiu, ktorá rozhodne o novom reaktore" [Bohunice awaits a major American test. Saková signed a key study that will decide on a new reactor]. pravda.sk (in Slovak). Retrieved 16 July 2026.
  3. ↑ "Vyraďovanie jadrovej elektrárne A1" [Decommissioning of A1 nuclear power plant]. njf.sk (in Slovak). Retrieved 9 September 2024.
  4. ↑ "EU accession brings early reactor closures". World Nuclear News. 1 January 2007. Retrieved 13 May 2025.
  5. ↑ a.s, Petit Press. "Pred 30 rokmi havarovala jadrová elektráreň A1 v Jaslovských Bohuniciach" [30 years ago, the A1 nuclear power plant in Jaslovské Bohunice crashed]. ekonomika.sme.sk (in Slovak). Retrieved 7 November 2020.
  6. ↑ "Bohunice V1 reactors fully dismantled". World Nuclear News. 1 September 2021. Retrieved 13 May 2025.
  7. ↑ "Slovakia Sets Global Example for Nuclear Power Plant Decommissioning". IAEA Bulletin. 1 April 2023. Retrieved 13 May 2025.
  8. ↑ "Government: Second Nuclear Reactor of V1 Will Be Re-Launched". Slovak news agency. Archived from the original on 20 January 2009. Retrieved 10 January 2009.
  9. ↑ "The state stopped nuclear plant re-launch" (in Slovak). 19 January 2009.
  10. ↑ "SE switches on two upgraded nuclear power units". Climate Sceptics. 15 November 2010. Retrieved 13 May 2025.
  11. ↑ "Joint venture for new Slovak nuclear plant". World Nuclear News. 1 April 2008. Retrieved 13 May 2025.
  12. ↑ "Vláda SR schválila kroky potrebné na výstavbu nového veľkého jadrového zdroja na Slovensku" [The Slovak government has approved the steps necessary for the construction of a new large nuclear power plant in Slovakia]. economy.gov.sk (in Slovak). Retrieved 16 July 2026.
  13. ↑ "Jadrová technológia Westinghouse AP1000® je overená vo svete a pripravená pre Slovensko" [Westinghouse AP1000® nuclear technology is proven worldwide and ready for Slovakia]. westinghousenuclear.com (in Slovak). Retrieved 16 July 2026.