Batang Lupar 1 Bridge

Batang Lupar 1 Bridge
Coordinates1°30′49.3″N 110°58′37.3″E / 1.513694°N 110.977028°E / 1.513694; 110.977028 (Batang Lupar 1 Bridge)
Carries2 traffic lanes (JKR R5 standard)
CrossesBatang Lupar (Lupar River)
LocaleSarawak, Malaysia
BeginsSebuyau, Samarahan Division
EndsTriso (Maludam), Betong Division
Official nameJambatan Batang Lupar 1
Other nameKing of Bridges
Named forLupar River
OwnerGovernment of Sarawak
Maintained byPublic Works Department Sarawak
Heritage statusRecognised by the Malaysia Book of Records (longest bridge crossing a river in Malaysia)
Characteristics
DesignCable-stayed bridge
MaterialComposite concrete and high-strength structural steel
Total length4.844 km (4,844 m)
Height108 m (pylon height)
Water depth90 m (pile foundation depth)
Traversable?Yes
Longest span598.8 m
Piers in water
87
26 m (navigational clearance)
No. of lanes2 lanes (single carriageway)
History
Engineering design by
HSS / Hewson Consulting
Constructed byPerbena Emas Sdn Bhd / China Railway Major Bridge Engineering Group
Built2021–2026
Construction start2021
Construction endMay 2026
Construction costRM848,745,087.50 (fully funded by the Government of Sarawak)
Opened21 May 2026[1]
Inaugurated21 May 2026 (pre-opening)
9 July 2026 (official opening)
ReplacesBatang Lupar ferry service (Triso ferry)
Statistics
TollToll-free
Location
Interactive map of Batang Lupar 1 Bridge

The Batang Lupar 1 Bridge (Malay: Jambatan Batang Lupar 1) is a two-lane, one-way bridge crossing the Lupar River in Sarawak, Malaysia. It connects Sebuyau with Maludam (Triso). With a total length of 4.884 km (3.035 mi), it is currently the longest river bridge in Malaysia. The RM848 million project was fully funded by the government of Sarawak. Due to its length and scale, the bridge is commonly referred to as the "King of Bridges".[2] The bridge was constructed to JKR R5 standards and is supported by 87 bridge piers.[3] Its main structure is a cable-stayed bridge with a length of 598.8 m (1,965 ft). The bridge provides a ship navigation clearance of 26 m (85 ft) in height and 250 m (820 ft) in width. The bridge was opened to the public on 21 May 2026. Its opening ended the Batang Lupar (Triso) ferry service, which had previously operated at the crossing. The bridge now provides a direct road connection along the Sebuyau–Triso coastal corridor, eliminating the need for vehicles to use the ferry service.[1][4]

History and construction

Construction of the bridge is a key component of the Sarawak government's Coastal Road Network and Second Trunk Road plan, aiming to stimulate sustainable socioeconomic growth and commercial activities in the coastal region.[3] The construction contract was awarded to the local firm Perbena Emas Sdn Bhd in partnership with China Railway Major Bridge Engineering Group Co. Ltd (MBEC), a subsidiary of the China Railway Engineering Group (CREC).[5]

The project, which costs approximately RM848.7 million, reached a major milestone on 26 January 2026 when the main structure connection work was successfully completed. The structural connection ceremony was officiated by the Deputy Minister for Infrastructure and Port Development, Datuk Ir. Aidel Lariwoo, alongside JKR Sarawak Director Datu Dr. Cassidy Morris.[3][6] The bridge engineering also utilises specialised bearings and expansion joints provided by the Mageba Group.[7] The opening ceremony of the bridge was officiated by the Deputy Premier of Sarawak, Datuk Amar Douglas Uggah Embas on 21 May 2026, while the long-operating Sebuyau-Triso ferry service was completely terminated on the next day, 22 May 2026.[1][4] The opening of the bridge shortened the travel time across the river to around 5 minutes compared to the previous ferry service which often took between 30 and 45 minutes, and is expected to stimulate the growth of agriculture, tourism and local resource development sectors.

References

  1. 1 2 3 "Sarawak's Batang Lupar 1 Bridge: Malaysia's longest river-crossing bridge opens today". SoyaCincau. 21 May 2026. Retrieved 24 May 2026.
  2. ↑ "Batang Lupar 1: Msia's longest river-crossing 'King of Bridges' to open mid-May ahead of Gawai". DayakDaily. Retrieved 16 March 2026.
  3. 1 2 3 "The connection of the Batang Lupar 1 Bridge's main structure reaches a significant milestone". TVS. MIPD Sarawak. 26 January 2026. Retrieved 16 March 2026.
  4. 1 2 "Jambatan sungai terpanjang di Malaysia dibuka kepada lalu lintas" (in Malay). Malaysiakini. 21 May 2026. Retrieved 24 May 2026.
  5. ↑ "马来西亚鲁巴跨海大桥首个主塔封顶 (First main tower of Malaysia's Lupar Sea-crossing Bridge topped out)" (in Chinese). China Railway Engineering Group (CREC). 11 February 2025. Retrieved 16 March 2026.
  6. ↑ "中企承建马来西亚鲁巴跨海大桥合龙" (in Chinese). Xinhua News Agency. 26 January 2026. Retrieved 16 March 2026.
  7. ↑ "Batang Lupar 1 Bridge Technical Brief" (PDF). Mageba Group. Retrieved 16 March 2026.