Amritsar–Shri Mata Vaishno Devi Katra railway line

Amritsar–Shri Mata Vaishno Devi Katra railway line
Pathankot Junction is an important railway station on Amritsar–Shri Mata Vaishno Devi Katra railway line
Overview
Native nameअमृतसर–श्री माता वैष्णो देवी कटरा रेल लाइन
StatusOperational
OwnerIndian Railways
LocalePunjab and Jammu and Kashmir
Termini
Service
TypeRegional rail, passenger and freight
OperatorNorthern Railway
History
Opened1975
Technical
Track length284 KM
Number of tracks2
Track gauge5 ft 6 in (1,676 mm) broad gauge
Electrification25 kV 50 Hz AC overhead line
Operating speedUp to 110 km/h
Highest elevation
Route map
Amritsar–Jammu Tawi main line
km
0
Amritsar
5
Majitha
10
Chheharta
18
Ajnala
to Fazilka–Amritsar line
25
Batala Junction
33
Dhariwal
42
Gurdaspur
50
Dera Baba Nanak
60
Pathankot Junction
to Pathankot–Jammu line
75
Kathua
90
Hiranagar
105
Jammu Tawi
to Samba–SMVD Katra line
km
Source: India Railways – map created for reference purposes only. This map shows stations, rivers, minor halts, highways, and connecting lines from Amritsar to Jammu Tawi.

The Amritsar–Shri Mata Vaishno Devi Katra railway line is a broad-gauge railway line connecting Amritsar in Punjab to Shri Mata Vaishno Devi Katra railway station in Jammu and Kashmir. The line is operational and serves as a vital corridor for both passenger and freight trains in northern India. The route also serves pilgrims traveling to Shri Mata Vaishno Devi Katra.[1][2]

History

The line was constructed in the year 1975 to enhance connectivity between Punjab and Jammu and Kashmir. Over the years, it has undergone upgrades, including track doubling and partial electrification to improve speed and efficiency.

Route and major stations

The line covers a distance of approximately 207 km, with the following major stations:

Electrification

The line has been partially electrified with 25 kV 50 Hz AC overhead traction. Full electrification is planned to further improve operational efficiency.

Services

Several trains operate on this route, including:

Future developments

There are proposals for high-speed rail corridors on this route, which aim to reduce travel time and increase capacity. Other modernization projects include further electrification and track doubling.

See also

References

  1. ↑ Singh, Suman (10 March 2025). "Punjab Railways Suspend Night Operations In Border Areas Of Jammu, Punjab". NDTV. p. 2.
  2. ↑ Sharma, Karun (11 August 2025). "Ravneet Bittu Expresses Gratitude to Prime Minister for New Vande Bharat Train from Katra to Amritsar". The Hans India. p. 2.