Amisk Wâciw Âsokan

Amisk Wâciw Âsokan
Beaver Hills Bridge
Coordinates53°37′42.31″N 113°19′20.68″W / 53.6284194°N 113.3224111°W / 53.6284194; -113.3224111
CarriesPedestrians and bicycles
CrossesNorth Saskatchewan River
LocaleEdmonton/Strathcona County, Alberta, Canada
Official nameAmisk Wâciw Âsokan
Maintained byCity of Edmonton
Characteristics
Total length230 m (750 ft)
History
Construction startJune 2023
Construction endAugust 2025
Location
Interactive map of Amisk Wâciw Âsokan
Beaver Hills Bridge

Amisk Wâciw Âsokan (ahmsk-wahCEE Ah-sho-kuhn), also known as the Beaver Hills Bridge, is a pedestrian bridge spanning the North Saskatchewan River between Edmonton and Strathcona County, Alberta.

Construction started in June 2023.[1] It was opened to the public in August 2025. An official grand opening and a revealing of the name is expected in September 2025.[2]

Gathering areas at both ends of the bridge, multi-use pathways connecting to existing trails and a public washroom will be added later. Cost of the project is $41.4 million, which was split between the River Valley Alliance, the City of Edmonton, and Strathcona County.[3]

References

  1. ↑ "Edmonton-Strathcona County Footbridge Project celebrates sod turning". Renew Canada. 8 June 2023. Retrieved 22 August 2025.
  2. ↑ Knopp, Elliott (5 August 2025). "New river valley footbridge connecting Edmonton to Sherwood Park opens to the public". CityNews. Retrieved 22 August 2025.
  3. ↑ Gordon, Lucy (21 August 2025). "Edmonton-Strathcona Footbridge delights nature enthusiasts, connects River Valley trails". Sherwood Park News. Retrieved 22 August 2025.